Fountain Creek, Pueblo, Colorado--phase I general design memorandum : communication from the Assistant Secretary of the Army (Civil Works) transmitting a letter from the Chief of Engineers, Department of the Army, dated December 23, 1981, submitting a report.
1984
P C762
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Details
Title
Fountain Creek, Pueblo, Colorado--phase I general design memorandum : communication from the Assistant Secretary of the Army (Civil Works) transmitting a letter from the Chief of Engineers, Department of the Army, dated December 23, 1981, submitting a report.
Published
Washington : U.S. G.P.O., 1984.
Call Number
P C762
Description
xix, 695 pages : illustrations, maps ; 24 cm.
System Control No.
(OCoLC)10742027
GPO Item No.
996-A
996-B (MF)
996-B (MF)
Note
"Referred to the Committee on Public Works and Transportation."
Distributed to some depository libraries in microfiche.
"March 19, 1984."
Distributed to some depository libraries in microfiche.
"March 19, 1984."
Bibliography, etc. Note
Bibliography: pages 235-237.
Record Appears in
Government Document Classification Number
Y 1.1/7:98-183
Sub-location
/For holdings information see record for: United States congressional serial set [ANALYZED]/
Added Corporate Author