Increasing the size of the Big Thicket National Preserve in the state of Texas by adding the Village Creek Corridor Unit, the Big Sandy Corridor Unit, and the Canyonlands Unit : report (to accompany H.R. 919).
1989
P C762
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Details
Title
Increasing the size of the Big Thicket National Preserve in the state of Texas by adding the Village Creek Corridor Unit, the Big Sandy Corridor Unit, and the Canyonlands Unit : report (to accompany H.R. 919).
Published
[Washington, D.C.?] : [U.S. G.P.O.], [1989]
Call Number
P C762
Description
8 pages ; 24 cm.
System Control No.
(OCoLC)20444752
GPO Item No.
1008-C
1008-D (MF)
1008-D (MF)
Note
Caption title.
Distributed to some depository libraries in microfiche.
Shipping list number: 89-598-P.
"July 17, 1989."
Distributed to some depository libraries in microfiche.
Shipping list number: 89-598-P.
"July 17, 1989."
Record Appears in
Government Document Classification Number
Y 1.1/8:101-145
Sub-location
/For holdings information see record for: United States congressional serial set [ANALYZED]/