Increasing the size of the Big Thicket National Preserve in the state of Texas by adding the Village Creek Corridor Unit, the Big Sandy Corridor Unit, and the Canyonlands Unit : report together with dissenting views (to accompany H.R. 3544) (including the cost estimate of the Congressional Budget Office).
1988
P C762
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Details
Title
Increasing the size of the Big Thicket National Preserve in the state of Texas by adding the Village Creek Corridor Unit, the Big Sandy Corridor Unit, and the Canyonlands Unit : report together with dissenting views (to accompany H.R. 3544) (including the cost estimate of the Congressional Budget Office).
Published
[Washington, D.C.?] : [U.S. G.P.O.], [1988]
Call Number
P C762
Description
13 pages ; 24 cm.
System Control No.
(OCoLC)18617066
GPO Item No.
1008-C
1008-D (MF)
1008-D (MF)
Note
Caption title.
Distributed to some depository libraries in microfiche.
Shipping list number: 88-583-P.
"September 23, 1988."
Distributed to some depository libraries in microfiche.
Shipping list number: 88-583-P.
"September 23, 1988."
Record Appears in
Government Document Classification Number
Y 1.1/8:100-959
Local Note
[Item 1008-C, 1008-D (microfiche); class:yl/cat:jmn/rev:wd]
[4 cds]
[4 cds]
Sub-location
/For holdings information see record for: United States congressional serial set [ANALYZED]/